In project (contracting) type SO, we need to provide following items (BoM Items) for Item A mentioned above.
Valve 150mm (Billable Item) - 1 No
Flange 150mm (Non-billable Item) - 2 Nos
Nut-bolts (Non-billable Item) - 16 Nos
Gaskets (Non-billable Item) - 2 Nos
Installation (Labour) - 1 No (Service)
We have created BoM for Item A including 5 Items as shown above.
Now, first 4 BoM items shown above are Drop-ship items. Can we make PO for those items? (As a work around - we created Material Request through Production Planning Tool).
Similarly Item 5 is Labour (sub-contracting) item. For that also we need to create Work Order (a sort of Purchase Order).
So, basically, we need Drop-Ship POs directly for BoM Items. Please advise.
When it’s going to take little time, here are some more food for thought.
While creating PO, it should take care of current stock (Projected Qty)
and Reorder Level.
Similar is the case for Manufacturing Item. It can create PO as per
Exploded Items in BoM.
At this outset, just wondering, whether separate entity called “Product
Bundle” is required? Product Bundle has a similar functionality as (Single
level) BoM. I have seen it in some ERP as “Sales BoM” (Or Packing BoM).
Moreover, costing related features (Like BoM) are desirable for Product
Bundle also.
Thanking you,
With Regards,
Deven Shah
Safeworld Systems Pvt Ltd
M - 09825060116