ERPNext Foundation ERPNext Cloud User Manual Blog Discuss Frappé* Donate

Quality checks between two warehouse


#1

how i can give quality check between two warehouses??

Store House 1
Store House 2

Material will shift from Store hose 1 to 2.


Quality Inspection for subassembly
#2

do you have checked the inspection Criteria Section in the item master?

image

without knowing whether is is or is not possible to get a QA procedure in between a move from Store House 1 > Store House 2 it at least implies that it may only be possible to add-in an inspection procedure “before Purchase” & “before delivery”, so there would not be any option out of the box to do what you want to do just by looking at these settings.


#3

There’s an option in Stock Entry to add Quality Inspection:

Checking this will make adding an inspection to the item mandatory to submit:

Perhaps this can be used to solve most of your issues regarding Quality Inspection at various stages.