Packing after manufacturing

How can packing be handled after manufacturing the item to get it ready for dispatch.
This will involve using packing items, labels, tags. The cost of the items should be accounted to the cost price of the product being shipped.

It is not packing list.

1 Like

Same issue, haven’t found a solution. Needs to be developed.

Has anyone got a logical design to solve this problem?

I found this thread only:

Thank You.
What if we start from the Pick List?
Creating a packing order, then
We pack the items individually, issuing packing materials and capturing costs for packing.
Or
Packing in an assorted manner, issuing packing materials and capturing costs for packing, but in this case the cost of packing materials and packing costs have to be distributed proportionately to the packed finished goods.