Change of Workstation during Manufacture(option in Timesheet)

Hi All,

This is a problem I faced while entering Timesheets.

Once a BOM with operations is created, the operations are assigned a specific machine/workstation.
But during manufacturing it is not necessary the same machine is used(in case of multiple machines of same kind), so in time sheets can an option be provided to choose another workstation incase the default workstation is busy with a certain task. Because the Timesheets dont allow for multiple enteries for the same time period on the same workstation( which is correct, since you cannot assign the same machine for two tasks at the same time.). This would be helpful.

I hope it is clear what I am trying to explain.

Thanks and regards
Ajit

@ajit.jain1
Please create a github issue as a feature suggestion for enhancement of Manufacturing module.
Thanks for your cooperation.